Behavioral Health Resource Center
Portland, OR | Healthcare
HVAC and plumbing design for the renovation of a former nightclub into a 24,000-square-foot behavioral health facility with an adjacent 7,000-square-foot plaza, focused on serving people experiencing homelessness with addiction and mental health programming.
Portland International Airport RCC
Portland, OR | Airports
Radiant HVAC design for office space levels of a new airport operations building, with panels, sails, ducts, and hydronic piping modeled in Revit in coordination with the architecture team.
Portland Public Schools Drinking Water
Portland, OR | Portland Public Schools | Education
Bid drawings and specifications for drinking fountain and cafeteria sink replacements across multiple schools as part of a district-wide lead reduction program.
The Portland Building HVAC TI Design
2017 | Portland, OR | City of Portland | Government
Full-demolition and remodel HVAC design for 15 floors of a historic downtown building, coordinating duct and terminal box routing with the architect to preserve an open ceiling aesthetic. Construction began October 2017.
Semiconductor Clean Room and Tool Installation Design
Semiconductors
Clean room and tool installation mechanical design for semiconductor clients, addressing chemical delivery, airflow sensitivity, lighting selection, and electromagnetic interference requirements. Work in this specialty dates to the 1990s.
Portland Water Bureau Groundwater Chemical Room Cooling
Portland, OR | Portland Water Bureau | Government
Air handling unit selection and ductwork design to cool a chemical room within the tight confines of an existing mechanical room, maintaining a precise temperature range.
HECC Coordination Offices HVAC Design
Portland, OR | Oregon Higher Education Coordinating Commission | Government
HVAC tenant improvement design for Oregon Higher Education Coordinating Commission offices at the Public Services Building, including identification of minimum outside air deficiencies on the HECC floors and coordination with the facilities team to correct ventilation operating procedures for heating season.