Mt. Vernon Downtown Flood Protection
2014 | Mount Vernon, WA | City of Mount Vernon | Stormwater & Flood Control
Prepared civil and structural plans, specifications, and estimates (PS&E) for a 1.7-mile-long floodwall system. The project features parking lots, Low Impact Development (LID) stormwater systems, roadway and pedestrian improvements, and coordinated utility tie-ins.
View project sourceElma High School Emergency Structural Repairs
2020 | Elma, WA | Elma School District #68 | Education
Provided structural analysis, design drawings, and recovery plans for emergency repairs after a vehicle collided with the high school's northwest corner. Set up safety and exclusion zones immediately on the day of the incident and coordinated with school officials and insurers to complete work on a highly restricted timeline.
View project sourceSimpson Timber Co. Mill 3 Explosion Response
Shelton, WA | Simpson Timber Co. | Industrial
Dispatched emergency engineering services within hours of an electrical explosion at Mill 3 in Shelton. Directed temporary safety controls and shoring, enabling the mill to resume operations within eight days, and subsequently executed a full structural retrofit and renovation over the following years.
View project sourceCougar Smith Road Realignment and Bridge Replacement
2005 | Matlock, WA | Cowlitz County / Local Agency | Bridges
Delivered bridge design and roadway alignment services for 2,500 feet of new roadway and a 210-foot single-span bridge over the Middle Satsop River. Scope included hydraulic analysis, biological assessment, wetland mitigation, and the implementation of a post-tensioning system for prestressed concrete super girders.
View project sourceMakah Reservation Sail and Wa'atch River Bridges
2010 | Clallam County, WA | Makah Tribe | Bridges
Completed roadway and structural PS&E for two bridges on the Makah Tribal Reservation. Work included embankments, sight distance optimization, pedestrian and bicycle access planning, stormwater controls, and subconsultant construction management.
View project sourcePort Blakely Cispus River Bridge
2011 | Lewis County, WA | Port Blakely LP | Bridges
Conducted engineering design and construction management for a 95-foot privately owned bridge. Leveraged a collaborative design-build approach with a construction partner to track costs in real-time, matching budget and structural load demands.
View project sourceSylvan Way Meadows Residential Development
2008 | Bremerton, WA | Big Sky Builders | Residential
Performed comprehensive roadway, storm, utility, and structural designs for a new residential development in Bremerton. The project represents one of the first residential developments in Washington State constructed utilizing full Low Impact Development (LID) methods.
View project source