SR 997/Krome Avenue Reconstruction from SR 94 to SR 90 (7 Miles)
2017 | Miami-Dade County, FL | FDOT District 6 | Highways & Roads
Full reconstruction widening Krome Avenue from two lanes to a four-lane divided facility with concrete pavement. Work included over 1.1 million CY of embankment, 370+ drainage structures, C-4 channel excavation, partial demolition and widening of the existing C-4 canal bridge, and new signal and lighting systems.
View project sourceI-395/SR 836/I-95 Reconstruction
Miami-Dade County, FL | FDOT District 6 / MDX | Bridges
CEI bridge inspection support for an $802 million P3 project with FDOT and Miami-Dade Expressway Authority. Includes complete reconstruction of I-395 with a signature 1,025-foot bridge spanning six arches, SR 836 elevated viaduct improvements, and I-95 concrete pavement replacement.
View project sourceSR 997/Krome Avenue Widening from SW 136 Street to SR 94 (3.5 Miles)
2017 | Miami-Dade County, FL | FDOT District 6 | Highways & Roads
Full reconstruction widening Krome Avenue to a four-lane divided roadway with concrete pavement, two new bridges over the Black Creek Canal, shared-use path, and new drainage and signal systems.
View project sourceBroward Boulevard Bridge Replacement and Roadway Improvements
2018 | Fort Lauderdale, FL | FDOT District 4 | Bridges
CEI roadway and bridge inspection for bridge replacement over the North Fork of the New River, roadway resurfacing, ADA ramp upgrades, signal mast arm upgrades, and bike lane construction.
View project sourceFlamingo Road Improvements
2016 | Broward County, FL | FDOT District 4 | Highways & Roads
CEI roadway inspection for 3.23-mile improvements including ADA pedestrian ramp upgrades, resurfacing, guardrail upgrades, overhead signing, drainage improvements, and bicycle lane additions.
View project sourceA1A Improvements from County Line Road to Seacrest Parkway
2016 | Hallandale Beach and Hollywood, FL | FDOT District 4 | Highways & Roads
Roadway improvements consisting of removing old asphalt and repaving with new asphalt, upgrading signalization, installing stamped asphalt at pedestrian crosswalks, installing pedestrian countdown timers, installing 'Share the Road' signage and pavement markings, and installing new mast arms.
View project sourceUS 1 Improvements from Broward Boulevard to NE 17th Way
2016 | Fort Lauderdale, FL | FDOT District 4 | Highways & Roads
Roadway improvements consisting of removing old asphalt and resurfacing the roadway, upgrading sidewalks and ramps to meet ADA requirements, repairing, adjusting, and replacing drainage structures, upgrading traffic signals to mast arm signals, installing a new signalized pedestrian crossing, upgrading existing pedestrian signals to countdown timers, and creating an Alternative Bike Route with signage and markings.
View project sourceSR 997/Krome Avenue from MP 10.935 to Okeechobee Road
2017 | Miami-Dade County, FL | FDOT District 6 | Highways & Roads
Full reconstruction and widening of the Krome corridor from an undivided two-lane road to a four-lane divided facility with a 40-foot median. Work included reconstructing roadway and shoulders, demolishing and removing two existing bridges over the C-6 Canal, and constructing two 150-foot single span bridges, alongside installing guardrail, drainage, and signalization.
View project sourceOld Dixie Highway Reconstruction
2018 | Fort Lauderdale, FL | FDOT District 4 | Highways & Roads
Roadway reconstruction including reducing travel lane widths and modifying shoulders to add four-foot bike lanes, constructing sidewalks, installing drainage, adding a roundabout, installing pedestrian lighting, constructing raised intersections and crosswalks, and adding new signing and pavement markings.
View project sourceTurnpike Northbound Exit to Glades Road & Glades Road Improvements
2018 | Palm Beach County, FL | FDOT Turnpike Enterprise | Highways & Roads
Glades Road Northbound Ramp and intersection improvements in Palm Beach County. Project includes widening of Glades Road to provide dual right access, adding an additional lane on the exit ramp, constructing a low level cast in place bridge, bridge coating, signalization upgrades, overhead sign structure installation, drainage, lighting, and utility line relocation.
View project source