Bridge and Bulkhead Construction Berths S1, E1, and E2
2014 | Bayonne, NJ | Marine
Served as the engineer of record (EOR) for the administration and inspection of a federally funded project including the construction of a new access bridge, approximately 1,300 linear feet of heavy steel sheet pile bulkhead, and site grading. Responsibilities included daily inspections, contract negotiations, submittal reviews of contractor applications for payment, and administrative closeout.
Himmelhoff Dock Partial Inspection
2014 | Jersey City, NJ | Marine
Performed a limited above and below water level I post-event inspection of a portion of a concrete dock platform that underwent severe settlement after Super Storm Sandy. Evaluated existing conditions and environmental factors contributing to rapid building settlement.
103 Market Street Building Assessment
Commercial
Conducted an emergency building stability assessment, select demolition planning, and stabilization design for a structure damaged by a commuter bus impact. Provided on-site resident engineer and inspection services to protect public safety and facilitate bus extraction.
Greenville Yards Hydrographic Survey
2014 | Jersey City, NJ | Marine
Collected and processed hydrographic/bathymetric data for a 1,500-foot by 250-foot channel and barge berth area with transects spaced at 25 feet. Mapped existing depths and located mooring piles to support the preparation of record surveys and dredge plans.
Sylvan Lake Hydrographic & Sediment Sampling
2013 | Avon-By-The-Sea, NJ | Avon-By-The-Sea | Water Resources
Performed collection of hydrographic data and sediment sampling to assess Sandy's environmental impact on a shallow coastal lake. The processed data supported the preparation of a record survey and dredge plan for the municipality.