Rockefeller Refuge Levees
Grand Chenier, LA | Natural Resources
Scope included dredging and soil placement to refurbish approximately 85 miles of earthen levees on the Rockefeller Wildlife Refuge in Grand Chenier, LA, damaged by Hurricanes Laura and Delta. Work involved topographic and bathymetric surveys, earthwork calculations, plan production, and project management.
Pumpkin Bayou Dredging
Louisiana | Water Resources
Scope involved dredging cleanout of approximately 96,100 cubic yards in Pumpkin Bayou. K&M designed the cleanout and managed execution through completion.
Cameron Amenities
Cameron, LA | Commercial
Construction administration and project management for community amenities on the Calcasieu River Ship Channel Loop Pass, including a boardwalk, floating dock, marina, boat launch, restaurant, market, and RV resort.
Oyster Reef Restoration - Calcasieu Lake & Sabine Wildlife Refuge Phase IV
Southwest Louisiana | Natural Resources
Engineering design, topographic and bathymetric data collection, construction administration, and project management for the Calcasieu Lake and Sabine Wildlife Refuge Reef Restoration Project Phase IV.