Best Western GLO Hotel Land Development
Providence, Rhode Island | Sarchi Group Management and Construction | Hospitality
Site development plans and permitting for a proposed six-story, 76-room hotel in Providence, Rhode Island, including a two-story structured parking deck, stormwater management system, utility connections, and geotechnical exploration with three deep borings exceeding 100 feet.
View project sourceRoger Williams University College of Engineering - Experiential Learning Center
Bristol, Rhode Island | Roger Williams University | Education
Site plans and permitting for a proposed 10,200 square foot School of Engineering experiential learning center at Roger Williams University, including sidewalks, retaining walls, drainage, utility services, and five geotechnical borings.
View project sourceThe Residence at Limerock
Smithfield, Rhode Island | A & R One, LLC | Multifamily Residential
Design of a 28-unit mixed-use, multi-family residential development with six affordable housing units and three commercial pad lots, including utility services, new roadway, and stormwater management.
View project sourceOliver Stedman Government Center
South Kingstown, Rhode Island | ABM Group, LLC | Government
Site engineering and landscape architectural services for a municipal government center, including parking lot improvements, roadway widening, curbing, pavement replacement, and native plantings.
View project sourceAnchor Subaru Dealership
North Smithfield, Rhode Island | Anchor Subaru | Commercial
Site development plans for a new 40,000 square foot full-service dealership and additions, including parking lots, grading and drainage, landscaping, utility services, community OWTS, and 22 geotechnical borings.
View project sourceDrainage Master Plan - University of Rhode Island
Kingston, Rhode Island | University of Rhode Island | Education
Study of the existing drainage system on the Kingston Campus, identifying deficiencies causing localized flooding and water quality degradation. JCE created a hydrologic/hydraulic model of the White Horn Brook and developed a master plan report for future improvement of the storm drainage system.
View project source