Beaver River Bridge Segment Falsework & SOE
Beaver River, PA | Bridges
Designed segment falsework for a 5-span eastbound/westbound segmental bridge over the Beaver River. Scope of work included soldier beam and lagging designs with deadman tieback anchors, geogrid-stabilized fill walls, and soil nail walls up to 40 feet tall to support cuts into hillsides and adjacent roadways.
View project sourceSR 50 over Chartiers Creek Excavation Support
Chartiers Creek, PA | Bridges
Designed a soldier beam and lagging system with tiebacks under tight right-of-way construction easements and complex utility conflicts.
View project sourceWest College Aspen Heights & PSU Garage
State College, PA | Commercial
Provided engineering designs for micropile casings, soldier beam and lagging support of excavation walls, and foundation micropiles built to handle compression, tension, and lateral loading.
View project sourceCity of Warren WPCC Pump Station Shoring
Warren, PA | Wastewater
Designed sheet pile shoring with tiebacks and waler rings to support excavations for pump station additions under challenging site conditions.
View project sourceMartinsburg VA Hospital Addition Slope Stabilization
Martinsburg, WV | Healthcare
Designed a temporary slope stabilization system for excavation support and performed comprehensive stability analyses to implement a soil nail and reinforced shotcrete slope stabilization solution.
View project sourceSR 29 over Norfolk Southern Railroad Demolition & Erection
PA | Bridges
Completed the demolition plan, girder erection and lateral restraint plan, overhang falsework designs, and temporary support of excavation systems along the railroad corridor.
View project sourceUniversity of Pittsburgh Chiller Plant Soil Nail Wall
2024 | Pittsburgh, PA | Education
Designed a 22-foot-tall soil nail wall for utility excavations supporting a new chilled water plant. The utility system incorporates rainwater collection to reduce city stormwater runoff.
View project sourceUniversity of Pittsburgh Recreation & Wellness Center Support of Excavation
2024 | Pittsburgh, PA | Education
Designed multiple temporary support of excavation systems for a 270,000-square-foot state-of-the-art wellness facility, successfully integrating discovered legacy shoring structures into the final engineering design.
View project sourceWVU Women's and Children's Hospital Hybrid Shoring
2020 | Morgantown, WV | Healthcare
Developed an innovative three-sided hybrid shoring system to support construction of the 360,000-square-foot facility. The system combined cantilevered steel soldier beams and wood lagging with a rock bolt stabilized rock cut face.
View project sourceState College Core Signature Development Shoring
2023 | State College, PA | Mixed-Use
Engineered a temporary shoring solution for an excavation exceeding 30 feet in depth, successfully managing complex karstic soil conditions for a 12-story mixed-use residential and retail tower.
View project sourcePA Turnpike Cranberry Township Interchange Shoring
2019 | Cranberry Township, PA | Highways & Roads
Designed temporary shoring for three separate structures in a high-traffic highway corridor, utilizing soldier beam and lagging walls paired with rock anchors, deadman anchors, and custom strut and waler bracing.
View project sourceSummerhill Bridge Lift
2022 | Summerhill, PA | Bridges
Coordinated and engineered the lifting and placement of an entire bridge structure under highly restricted timeframes to accommodate active rail traffic on Norfolk Southern mainlines.
View project sourceSR 376 over SR 885 Bridge Widening & Jacking
2020 | Pittsburgh, PA | Bridges
Engineered bridge jacking plans to replace bearings, alongside demolition and steel girder erection plans, under complex multi-phase urban traffic control constraints on a major Pittsburgh highway.