Norfolk Southern Railroad PTC Installation
Norfolk Southern Railroad | Rail
Installed over 2500 miles of positive train control (PTC), including 3000 PTC radio towers and in-service test inspections. Designed, programmed, and tested over 1000 Federal grade crossing warning systems, Quiet Zones, and advanced preemption, as well as provided design, programming, and simulation for 600 track miles of PTC.
View project sourceNorth Villa Rica Signal Verification
North Villa Rica | Rail
Provided verification and validation of Vital Railroad Signal Application Software for E-ATC/PTC and grade crossing warning approaches via fiber network.
View project sourceBrightline Vital Software Programming
AAF/Brightline/Virgin Rail | Rail
Provided vital software programming for Alstom's version of PTC, E-ATC, and grade crossing warning approaches via fiber networking in a high-speed envelope.
View project sourceBrightline Grade Crossing Design Review
AAF/Brightline/Virgin Rail | Rail
Performed design review for 86 high-speed envelope grade crossing warning systems from Cocoa Beach to Fort Pierce. This included four quad gates with island detection medians and channelization per FRA, AREMA, FDOT, and MUTCD requirements.
View project sourceCSXT PTC Design Engineering
CSXT | Rail
Supplied over 1000 track miles of PTC signal design engineering, including project management, preliminary engineering, high-rail site surveys, vital hardware and software engineering, PTC obsolescence, implementation, and back-office integration with the CXT Dispatch Center.
View project sourcePort Everglades and Port of Miami Signalization
Florida East Coast Railway | Rail
Designed and installed traffic control and cab signals serving Port Everglades, and designed traffic control and cab signals with power-operated switches at four control points to increase capacity for the Port of Miami.
View project sourceMusic City Star Commuter Line
Nashville and Eastern | Rail
Designed and installed 40 miles of traffic control signals for the Nashville commuter line, including four control points, 30 crossings, and 10 automatic signals.
View project sourceEvansville and Western Railroad Train Control
Evansville and Western Railroad | Rail
Designed and installed 75 miles of train control from Mount Vernon, IN to Mount Vernon, IL, including 29 control points, two railroad crossings, ten automatic signals, and ten highway crossings.
View project sourceKentucky Dam Lock Signalization
Paducah and Louisville Railway | Rail
Designed and installed traffic control signals over the locks of Kentucky Dam in Grand Rivers, KY, including three control points, two automatic signals, one river lock, and one crossover.
View project source