State Pier Wind Energy Project
New London, CT | Infrastructure
Geotechnical peer review for a $250 million redevelopment of waterfront piers in New London, CT into a heavy-lift port facility supporting three offshore wind projects totaling over 1,700 MW.
View project sourceMartin's Point Bridge
Portland, ME | VHB | Bridges
Geotechnical peer review for a 1,300-foot design-build bridge carrying US Route 1 between Portland and Falmouth Foreside, Maine.
View project sourceWinthrop Square Tower
Boston, MA | Commercial
Geotechnical peer review for a 60-story building in downtown Boston's financial district with four levels of underground parking constructed using the up-down method.
View project sourceMillennium Tower - Foundation Settlement Evaluation
San Francisco, CA | Commercial
Forensic evaluation and mediation testimony on settlement and foundation performance for a 58-story building in San Francisco, including assessment of remedial options.
View project sourceTropical Storm Irene Emergency Response
VT | Vermont Agency of Transportation (VTrans) | Infrastructure
Triaged sites and developed on-the-spot designs to repair highway and railroad bridges, roadway embankments, and slopes that were taken out of service following historic flooding.
View project sourceMetroNorth Commuter Railroad Slope Stabilization
Bronx, NY | MetroNorth Commuter Railroad | Transit
Developed a slope stabilization scheme following a Tropical Storm Irene induced landslide that buried the tracks of the Hudson Line, shutting down service in the Riverdale section of the Bronx.
View project sourceTPC River Highlands Golf Course Emergency Repair
Cromwell, CT | Sports & Recreation
Performed soil borings and stability analyses, and engineered a solution involving geosynthetic reinforcement and riprap protection to repair a massive 60-foot-deep riverbank washout caused by Hurricane Ida.
View project sourceLinden Warehouse Facilities Due Diligence
Linden, NJ | Industrial
Provided pre-purchase and investment reviews of geotechnical aspects for multiple warehouse facilities ranging from 320,000 to 930,000 square feet.
View project sourceHospital Building Settlement Evaluation
Manhattan, NY | Healthcare
Provided forensic evaluation and mediation testimony for a claim relating to the excavation for a new hospital building with a two-level basement, featuring a sheet pile excavation support system.
View project sourceCentral Artery Project Tied-Back Excavation Review
Boston, MA | Aviation
Reviewed and analyzed the movement of a 60-foot-deep cut-and-cover tied-back soil mix wall excavation where the third harbor tunnel enters Logan International Airport.
View project source