Moccasin Bend WWTP Improvements
Chattanooga, TN | City of Chattanooga | Wastewater
Decades of engineering improvements at Chattanooga's Moccasin Bend wastewater treatment plant, supporting expansions from 40 MGD to 140 MGD with a peak treatment capacity of 260 MGD.
Punderson State Park Water Treatment Plant
Portage County, OH | Punderson State Park | Water Supply
Consolidated water supply for the 750-acre park from 10 groundwater wells and six individual treatment systems into a single centralized plant, with the clearwell serving as the building's foundation and a glass wall allowing visitors to observe treatment operations.
Lookout Mountain Water Line Replacement
Lookout Mountain, TN | Water Supply
Replaced century-old waterlines on Lookout Mountain with a new alignment that includes a 600-foot elevated section engineered to resist wind and seismic loads. Construction required minimal disturbance to National Park Service trails, with mules used to haul materials along sensitive sections.
Village of Marlboro Wastewater Treatment Plant & Sewer System
Marlboro, OH | Village of Marlboro | Wastewater
Eliminated on-site septic systems for approximately 100 homes and businesses by constructing a new wastewater treatment plant and sewer system. The project replaced a 70-year-old storm sewer that had contributed septic overflow to Walborn Reservoir, the drinking-water supply for nearby Alliance.
City of Massillon IFAS Nutrient Removal System
Massillon, OH | City of Massillon | Wastewater
Addressed EPA phosphorus and nitrogen limits without available tankage space by implementing an Integrated Fixed-Film Activated Sludge (IFAS) system that increased biological loading capacity within the existing plant footprint. At the time of installation, it was the first such system in Ohio.