4.5 MW Solar Farm
San Luis Obispo, CA | Solar
Civil engineering, stormwater pollution prevention planning, and construction administration for an 18-acre solar farm generating nearly 25 percent of the resident organization's total electricity needs, projected to save an estimated $17M over 20 years.
View project sourceShell Beach Storm Drain Outfall Replacement
Pismo Beach, CA | City of Pismo Beach | Stormwater & Flood Control
Storm drain replacement integrated with bluff stabilization to restore coastal access and repair a damaged bluff area at Shell Beach. Work included comprehensive engineering, inspections, and project management to improve resistance to wave action and visual appeal.
View project sourceSports Stadium FieldTurf Upgrade
San Luis Obispo, CA | Sports & Recreation
Design, field leveling, accessibility improvements, and storm drain and sanitary sewer upgrades for a synthetic turf installation at a large multi-purpose stadium, saving approximately 2.8 million gallons of water annually.
View project sourcePublic EV Charging Station Installation
San Luis Obispo, CA | Infrastructure
Project administration and compliance inspections for 40 smart EV charging stations installed across two locations, open to all EV drivers, verifying compliance with ADA and EVCS requirements.
View project source