Copamarina Beach Resort & Spa WWTP
Guánica, Puerto Rico | Copamarina Beach Resort & Spa | Hospitality
Design of a 52,000 GPD MBR wastewater treatment plant, using the Kubota Submerged Membrane Unit. This zero-discharge plant discharges its effluent through irrigation of the resort grounds.
View project sourceLa Piedra & Pasto Viejo Water Distribution System
Cayey, Puerto Rico | Water Supply
Design of a water distribution system consisting of a 4-mile dedicated water transmission line, three pump stations, and two storage tanks.
View project sourceJagüeyes Water Treatment Plant
Villalba, Puerto Rico | Water Supply
Design of a 1.1 MGD water treatment plant. The design includes a conventional water filtration system consisting of rapid mix, slow mix, sedimentation, rapid sand/anthracite filtration system, and chlorine disinfection. The plant also includes a novel sludge treatment system.
View project sourceRío Cañas Water Distribution System
Mayagüez, Puerto Rico | Water Supply
Design of a water distribution system consisting of a 3-mile dedicated water transmission line, a deep well water pump station, and an intermediate pump station.
View project sourceCunningham Water Treatment Plant
Fauquier County, Virginia | Water Supply
Design of a battery of five deep well pumping systems, 4-inch and 6-inch transmission lines, a water treatment plant consisting of flow measurements, 5 filtering units, a chemical room, two water storage tanks, and a 430-GPM water distribution pump station.
View project sourceCunningham Farm Sewage Pump Station
Fauquier County, Virginia | Wastewater
Design of a 200 GPM sewage pump station.
View project sourceWilderness Shore Sewage Pump Station
Orange County, Virginia | Wastewater
Design of a 150 GPM dual sewage pump station provided with a pumparound system and an emergency power generator.
View project sourceMD School for the Blind - Water Distribution System
Nottingham, Maryland | Maryland School for the Blind | Education
Modeling of the water distribution system using EPANET.
View project sourceUniversity of Puerto Rico at Mayaguez - Flood Mitigation
Mayagüez, Puerto Rico | University of Puerto Rico at Mayaguez | Education
Mitigation of the frequent flooding of the UPRM Campus due to low hydraulic capacity of the channelized Quebrada de Oro. Design of two large detention areas upstream of the flooding area to reduce the peak discharge in the channel. This project also includes hydraulic modeling of the stormwater system using EPA SWMM and recommending modifications to improve the system to avoid frequent flooding.