Founded in 1975, BGE is a privately held engineering consulting practice providing comprehensive civil infrastructure services. It delivers solutions to public and private clients across six states, specializing in design, planning, surveying, and construction management.
A seven-mile design-bid-build highway expansion project. It included complete right-of-way construction, 22 bridges, pedestrian and bicycle access, intelligent transportation systems (ITS) technology, and utility relocations.
Served as the primary project engineer supporting the ongoing redevelopment of Memorial City Mall and the Memorial Hermann Hospital Memorial City Campus.
Advanced Air Permitting Solutions for Complex Manufacturing Facilities
Texas | Manufacturing
Secured a complex NSR case-by-case air permit for a manufacturing facility by combining site-specific emissions testing, advanced dispersion modeling, and strategic regulatory planning.
Permian Basin, TX | Power Transmission & Distribution
Delivered surveying, SUE, and right-of-way services in the Texas Permian Basin, replacing 120 single-circuit structures with double-circuit steel monopoles to improve regional power reliability.
Helped a West Houston community achieve a mandated ten-year, 60% reduction in potable water usage, serving as a model for long-term regional water management.
Fast-tracked the full-facility design of two drain tunnels and a concrete pump station using virtual reality and 3D modeling, lowering Interstate 35 by 40 feet and adding overhead greenspace.
BGE's Traffic Team have kept this large lighting and ITS project on schedule and have been proactive in addressing any issues despite various complexities and challenges posed by site conditions on two major highways. They have always communicated and coordinated in a clear, effective, and professional manner; ensured issues were communicated promptly with all stakeholders.
I have been a client of BGE since the 1970's. BGE has been very professional in the planning and design of the public infrastructure that will be emplaced in the initial 48-acre development. While we have had many delays at the municipal level for approval of our plans, we, with BGE's continued perseverance, finally succeeded in obtaining City approval. They know the pitfalls to avoid and how to efficiently maneuver through the City bureaucracy without creating ill will and delaying the approval process.