BD Utility Chiller Plant (Project Granite)
2015 | BD | Life Sciences
An integrated architectural and engineering design for a utility chiller plant, executed across five phases. The project involved a facility condition assessment, tenant improvements, and the design of mechanical, electrical, plumbing, and process piping systems to facilitate the relocation of approved systems.
Oracle Office Buildings Facility Condition Assessment
2012 | Redwood Shores, CA | Oracle | Commercial
A comprehensive Facility Condition Assessment of six office buildings in Redwood Shores, including a LEED assessment and certification path. The project was followed by additional assessments, controls evaluations, and equipment replacement designs.
Hitachi Taurus Clean Room Expansion & Multi Tool Installation
2011 | Hitachi Global Storage Technologies | Semiconductors
Design of a 20,000-square-foot Class 100 wafer fabrication cleanroom expansion and 5,000 square feet of support area, including a new gowning facility. The project also included subsequent multi-tool installation designs.
FDIC Commercial Office Building Integrated Audit
2011 | Federal Deposit Insurance Corporation | Federal
An integrated building audit and design solutions to achieve an Energy Star rating and LEED-Existing Building Operations & Maintenance (EBOM) certification, successfully reducing energy costs and consumption.
Headway Building 1 Clean Room Expansion
2010 | Headway Technologies | Semiconductors
Engineering services for a 12,000-square-foot expansion of a cleanroom manufacturing area.
Dimatix Cleanroom Expansions & Infrastructure Upgrades
2007 | Dimatix | Manufacturing
A series of engineering and design projects including a cleanroom expansion, electrical system upgrades, chiller and HVAC improvements, hydrofluoric water treatment systems, and PipeFlo analysis.
IBM Taurus Facility Clean Room Expansion
2002 | IBM Corporation | Semiconductors
Remodeling of 36,000 square feet of an existing facility to accommodate a Class M3 cleanroom with an ultra-clean floor system, designed in phases to avoid interrupting active manufacturing operations.